Home CCA Holidays Photo Gallery Feedback Contact us What's New Results Students
Welcome to JNV Bahraich Welcome to JNV Bahraich Welcome to JNV Bahraich Welcome to JNV Bahraich

Infrastructure

 
I
Area of land  allotted (in acres)
:
73 Acrs
Whether land transferred in the Name of Samiti
:
Yes
Vidyalaya shifted to permanent buildings on
:
 
II
Status of Boundary Wall
a.  Brick Wall
:
Completed
b.  Barbed wire fencing
:
Boundary Wall requires raining
III
Permanent buildings constructed
:
CBRI (New Building)
CPWD (All Construction)
CBRI
IV
School building
:
Complete
V
Dormitories
:
Boys 08 complete Nos. with Warden Residence 02l Nos.
 
:
Girls 02 Nos. with Warden Residence 02 Nos.
VI
Kitchen/dining Hall
:
Complete / not complete, Area
No. of shifts required for all students  to take food
:
01
VII
Principal Residence
:
01 No.
VIII
Staff Quarters
:
Type III = 24 Nos.
 
:
Type II = 02 Nos.
 
:
Type  I  = 06 Nos.
 
:
SP Sheds converted into Staff Qrs.: 05 Nos.
IX
M.P. Hall
:
Available
X
Workshop
:
Available
XI
Type of O.H. Tank
:
Shaft Type
Its capacity
:
3.50 Lake Liters
Present Status
:
Working Satisfaction
XII
U.G. tank
N.A
Its capacity
:
 
Present Status
:
Working satisfactory / not satisfactory
XIII
D.G. Set
:
Available
 
:
Kirloskar make
 
:
10 KV Working, 15KV Both donated by present yr 2001
XIV
Sewage Pump
:
No H.P.
XV
Water Pump
:
25 H.P.
XVI
Electrification
 
Electric connection
:
Urban Feeder
Sub Station building
:
Complete
Street lighting
:
25 Nos. of Poles
Numbers of hrs. during day when power supply is available on an average.
:
12 hrs.
XVII
Playfields
:
 
400 metre track
:
Available
40 x 30 metre basket ball court
:
2 Nos.   – Available
40 x 30 metre volley ball court
:
06 Nos.   – Available
XVIII
Water supply
;
 
Tube Well
:
Potable,  02
Hand pump
:
Potable, 13
Connection from PHED
:
Nill
XIX
Rajiv Gandhi Smriti Van
:
Available
XX
Fire fighting arrangement
:
Working
XXI
Last date of cleaning of
:
 

Septic tank

:
June 2016
Water tanks
;
June 2016
XXII
Whether area around transformer is fenced
;
Yes
XXIII
Whether open wells, if any, are covered from top
:
N.A
XXIV
Works taken up under M&R fund during current year and last year :-
Year
Name of work  (M&R)4.50
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
2016-17
4.50
4.00 upto 31/01/2016
 

Copyright © JNV Bahraich 2012-2013 all rights reserved